Project 3A : Perspective

Issued date : 27 July 2009

We have to upload all the 3 sheets of perspective drawings on my homepage of project 1A. So, have a look at my homepage.

 

Project 3B : Projected Obelisk

Issued date : 31 July 2009

On one A2 catridge paper, we should project our own obelisk in at least 2 ways. We must draw the tearing of a part of the obelisk in the projection. Upon completion, we have to reduce the A2 size of catridge paper into A4 paper with black and white or greyscale.

This is my drawing on A2 catridge paper.

This is my A4 paper with greyscale.

Project 3C : Black Box

Cube and Black Box

Issued date :  03 August 2009

Our cubes must at a size of 500mm×250mm×250mm. Cube A and cube B is side by side. Cube A must have the subtraction elements and cube B must have the accretion elements. Cube B must be closed with transparency. The elements that have been eliminated in the subtraction cube A should be included as a design in the accretion cube B. Our cubes must use white mounting board for the whole design, include a transparency glued to the frame of cube B. The cubes should contain the light bulb.

This is my cube and when it is lighting.

The black box is use to keep battery that supply energy to the light bulb and wires.

This is my black box.

Make a Free Website with Yola.